Head cabin contract (and other electrical infrastructure)

When operating an energy generating farm, it will often be necessary to create certain land rights for the operator in order to allow the construction of one or more head cabins. Often, it will be a question of constituting surface rights, aimed at allowing the construction of one or more head cabins by the operator on land of which he is not the owner, as well as various easements aimed in particular at allowing the access of machines and persons to the head cabin, the passage of cables …

 

In this context, an agreement is necessary to determine the rights and obligations of the parties in compliance with legal and regulatory provisions. Often, these agreements will require special formalities (i.e. drafting an authentic instrument/notarial deed before a notary) for the purpose of proof or enforceability.

 

N.B.: A head-end cabin is an element of the electrical network used to interconnect this network with the production unit. It is intended to evacuate the energy produced by wind turbines to the medium or high voltage grid. This element of the network also houses the electrical equipment necessary for the proper functioning of the interconnection (safety, protection, etc.)

Related Topic Posts

Please note that this knowledge portal is still under development.

Title

We use technical cookies to ensure the proper functioning of the site, we also use cookies subject to your consent to collect visit statistics. Settings Accept

Tracking Cookies

We need this to streamline your experience on our website.